Rapport i.s.m. derden - D4.1

Monitoring plan zero-measurement

Rapporten

“Fine screens will be taken into operation at one of the two identical parallel waste water treatment lines of the WWTP Aarle-Rixtel, while the other treatment line will still be operated as a conventional system. In this way, the performance of the “fine screen line” can directly be compared with the performance of the conventional line. In order to properly evaluate the impact of the fine screens to the waste water treatment process, it is important that the performance of both purification lines are identical before the fine screens are put into operation. The report of the “zero-measurement” gives an overview of several parameters and the performances of both purification lines, and support the conclusion that both purification lines are identical before the fine screens are taken into operation.”

(Citaat: Kras, R., Roest, K. – Monitoring plan zero-measurement – Screencap D4.1 2017)

Download pdf
Heeft u een vraag over deze publicatie?